Solar ATAP is the rooftop solar programme for homes and businesses in Peninsular Malaysia, including Johor. It took effect on 1 Jan 2026 and replaced the old Net Energy Metering (NEM) scheme. You use the solar power yourself first, and any surplus sent to the TNB grid offsets your bill. Homes can install up to 5 kW on a single-phase supply or 15 kW on three-phase, and you apply through a SEDA registered installer, not on your own.

Updated 17 Nov 2026. General information, not legal or financial advice. Programme terms can change, so check SEDA and TNB before you sign with an installer.

Solar ATAP at a glance

Item Domestic (homes)
Start date 1 Jan 2026
Who can apply Registered TNB customers not already under NEM or SelCo
Maximum size 5 kW single phase, 15 kW three phase
Contract 10 years, then self-consumption only
How surplus is valued At the prevailing energy tariff rate for domestic users
Where to apply SEDA eATAP portal, through a Registered PV Service Provider
Sources: SEDA Malaysia and SolarQuarter. Confirm current terms with SEDA.

How the savings work

During the day your panels power your fridge, fans and air-conditioners first. Only the surplus flows to the grid. For homes, SolarQuarter reports that exports are valued at the prevailing energy tariff rate, which is lower than the full retail price you pay per unit. Installer guides also say unused credit does not roll over to the next billing period. In plain terms: Solar ATAP rewards using your own solar power in daytime, so it suits families who are home during the day or can run washing machines and air-conditioners then.

Want a landed home with a roof that suits solar?

Ask us about terrace and semi-D homes in Johor and their roof orientation.

Step by step

  1. Check your bill and supply. Note your monthly kWh use and whether your supply is single or three phase. This decides the maximum size.
  2. Pick a SEDA Registered PV Service Provider. Only a registered provider can submit your application on the eATAP portal. Ask for their registration and compare at least two quotes.
  3. Site survey and design. The installer checks roof direction, shade and structure, then proposes a system size and expected output.
  4. Application and approval. Small domestic systems need no technical study; larger ones may need a connection assessment.
  5. Installation, meter change and start. TNB installs the meter that records import and export, and your 10-year term begins.

Questions to ask before you sign

  • Is the price fully inclusive of application, meter and roof works?
  • What warranty covers the panels, inverter and workmanship, including roof leaks?
  • Does your house insurance or takaful need to be told about the new system?
  • In a gated community or strata landed scheme, do you need approval from the management for roof works?

Condo owners usually cannot use the programme for an individual unit on a sub-meter: SEDA excludes TNB accounts under tenant sub-meters in multi-tenant schemes. If you are still choosing a home, our first home guide for Johor Bahru covers the costs before you think about upgrades.

Looking for a home in Johor?

In new projects with Bumi lots, Bumiputera buyers get a Bumi SPA price 15% lower than the non-Bumi price. Ask us which projects have them.

Common questions

Can I still join NEM?

No. Solar ATAP replaced NEM from 1 Jan 2026 for new applicants. If you already have NEM, check your own contract terms with TNB.

Can I apply myself on the portal?

No. SEDA requires a Registered PV Service Provider to submit the application for you.

What happens after 10 years?

The system continues for self-consumption only, and exported energy no longer earns an offset.

Is there a quota?

The fixed quota was removed, but the government can still set limits if grid stability is at risk.

Sources: SEDA Malaysia, Solar ATAP concept and eligibility; SEDA eATAP portal; SolarQuarter, Malaysia launches Solar ATAP, 19 Dec 2025; Trexon, Solar ATAP vs NEM 3.0 (installer guide). General information, not legal or financial advice. Cover photo: Troy Mortier, Unsplash.

Tinggalkan Balasan

Alamat e-mel anda tidak akan disiarkan. Medan diperlukan ditanda dengan *

Shortlist for my budgetAsk about this