Tarikh Buka RTS Link Johor Bahru: Perkhidmatan Penumpang Feb 2027

· Rumah Bumi Johor

Traffic at the Johor Bahru to Singapore border crossing

Passengers should be able to ride the RTS Link between Johor Bahru and Singapore from February 2027. That is the new target given by the operator, RTS Operations (RTSO), in a statement on 2 Oct 2026. RTSO aims to complete every system test and trial run by 31 Dec 2026. The later date leaves room for the last works, an independent safety certification and the approvals needed from both governments.

The key facts about the line

  • Journey time. The ride from Bukit Chagar in JB to Woodlands North in Singapore takes around 5 to 6 minutes. MyMRT gives 6 minutes, while TheSmartLocal says about 5.
  • Capacity. Up to 10,000 passengers an hour in each direction, according to MyMRT.
  • Frequency and hours. In the full (ultimate) design, trains can run every 3.6 minutes at peak, per MyMRT. TheSmartLocal (6 Oct 2026) reports the first train at 6am and the last at midnight.
  • One clearance. Customs and immigration for both countries sit at the departure station, so you clear only once.
  • Rail links. At Bukit Chagar, a linkway connects to KTM Komuter and ETS trains.

What the new date means for Johor residents

The opening has slipped by roughly two months. The route and the stations have not changed. For people in JB who work in Singapore and cross every day, homes within walking distance of Bukit Chagar, or a short shuttle ride from it, still gain the most. The same homes are also the ones tenants will look for. If you are comparing projects near the RTS, or with a shuttle to the CIQ, it makes sense to look before the line opens.

Buying as a Bumiputera? In new projects that have Bumi lots, you get a Bumi SPA price 15% lower than the non-Bumi price. Not every project has them, so ask us first.

Five projects near the RTS and CIQ

Johor Bahru property

CondoWalk to CIQ & RTSFreeholdUnder construction

Aethera Residences

Completion2030
Layouts1+1 to 4 bed duplex, dual-key
AccessWe measured 520 m (7 min) on foot to the RTS on today’s route; about 400 m via a proposed covered walkway
Why it fits
Of the five, it has the shortest measured walk to the RTS station.
Johor Bahru property

CondoWalk to CIQ & RTSFreeholdUnder construction

Coronade Twins @ Coronation Square

CompletionAround 2030
Layouts1 bed to 3+1 bed duplex
AccessWe measured 770 m (10 min) on foot to the RTS on today’s route; about 210 m to the RTS and 250 m to JB Sentral/CIQ via proposed link bridges
Why it fits
Freehold, with a measured walk of about 10 minutes to the RTS.
Johor Bahru property

CondoWalk to CIQ & RTSFreeholdUnder construction

Gen Sphere

CompletionQ4 2029
Layouts1 to 3 bed, dual-key options
AccessAbout 400 m on foot to the CIQ; we measured 1,150 m (14 min) to the CIQ and 1,640 m (21 min) to the RTS on today’s route
Why it fits
The shortest walk to the CIQ quoted by any of the five developers, and one-bedroom units to start with.
Johor Bahru property

CondoWalk to CIQ & RTSFreeholdUnder construction

GenRise

CompletionQ4 2028
Layouts1+1 to 6 bed, dual-key concept
AccessAbout 720 m to JB Sentral/CIQ; we measured 1,370 m (17 min) to the CIQ and 1,850 m (23 min) to the RTS on today’s route
Why it fits
It is due first of the five, in Q4 2028.
Johor Bahru property

Serviced apartmentWalk to CIQ & RTSFreeholdUnder construction

Causewayz Square @ JBCC (EXSIM)

CompletionDecember 2030
LayoutsStudio to 3 bed, dual-key
AccessAbout 600 m to the CIQ via an approved link bridge that is not yet built; we measured 1,510 m (19 min) to the CIQ and 1,990 m (25 min) to the RTS on today’s route
Why it fits
Units start from studios, with many layouts to choose from close to the CIQ.

Common questions

When does the RTS Link open to passengers?

RTSO now expects passenger service to begin in February 2027, according to its statement of 2 Oct 2026.

Why was the opening pushed to February 2027?

The new timeline leaves time for the remaining works, an independent safety certification and approvals from both governments. System tests and trial runs are targeted to finish by 31 Dec 2026.

How long is the ride from Johor Bahru to Singapore?

About 5 to 6 minutes between Bukit Chagar and Woodlands North. You clear customs and immigration for both countries once, at the station you leave from.

Looking for a home near the RTS?

Tell us your budget and where you work. We will send projects that fit and check which ones have Bumi lots.

Sources: RTSO statement, 2 Oct 2026; MyMRT; TheSmartLocal (6 Oct 2026); our project pages. Cover photo: Ven Jiun (Greg) Chee, Unsplash.

4 respons kepada “Tarikh Buka RTS Link Johor Bahru: Perkhidmatan Penumpang Feb 2027”

  1. […] The Menteri Besar called 2027 significant because the RTS Link between Johor Bahru and Singapore is, in his words, expected to start operating in February. As reported, that is the officials' date and it may change. Our own page on the RTS opening, based on operator RTS Operations (RTSO), gives February 2027 as the target, subject to independent safety certification and approvals: RTS Link February 2027. […]

Tinggalkan Balasan

Alamat e-mel anda tidak akan disiarkan. Medan diperlukan ditanda dengan *

Shortlist for my budgetAsk about this