Senarai Semak Lawat Rumah Johor Bahru: Projek Baharu & Subsale 2026
· Rumah Bumi Johor
Viewing a home in Johor Bahru? Your checklist depends on what you are buying. At a new-launch sales gallery, you check the paperwork and the real unit behind the show unit. At a subsale, you check the title, any arrears and the defects. This page covers both, plus the 24-month defect liability period, in tables you can print or screenshot.
Updated 16 Nov 2026.
Want this checklist for a specific project?
Tell us the project or subsale unit and we will adapt it for you.
New launch: questions for the sales gallery
Print the page or screenshot the tables, and tick as you go. Get answers in writing where you can.
| Check | What to ask or look for |
|---|---|
| ☐ Approvals | Get the developer licence and sale permit numbers, then check them yourself. Our TEDUH guide shows you how. |
| ☐ Which agreement | The standard forms are Schedule G (landed homes) and Schedule H (buildings divided into parcels, such as condos). Ask for a blank copy to read first, and have a lawyer review it. |
| ☐ Completion and vacant possession (VP) | Ask for the VP deadline in the agreement, not the year in the brochure. See the section below. |
| ☐ Built-up vs land area | For a condo, ask if the built-up figure includes the balcony, air-con ledge and service areas, and ask for the net living area. For landed, get the land area, built-up area and lot shape. |
| ☐ Maintenance fee | Ask for the estimated monthly rate per sq ft, what it covers, how the sinking fund is set and who runs the building in the early years. |
| ☐ Facilities by phase | Which facilities (pool, gym, parking decks, shops) open at handover, and which come in a later phase? Mark them on the site plan. |
| ☐ Title type | Freehold or leasehold, and residential or commercial land use (some serviced apartments are commercial). This can affect loans and use. |
| ☐ Bumi lots | Ask whether the project has Bumi lots. Where it does, Bumiputera buyers get a Bumi SPA price 15% lower than the non-Bumi price. |
| ☐ Parking | Bays per unit, stacked or tandem, EV bays and visitor parking. Ask which bay type comes with your layout. |
Show unit or real unit: what can be different
A show unit exists to sell the layout. Use it as a design guide and ask what you will really get.
| Check | Ask or test |
|---|---|
| ☐ Fittings list | Ask for the fittings and finishes listed in the agreement. Furniture, lights, wall panels and some appliances in the show unit may not be included. |
| ☐ Room size and furniture | Bring a measuring tape. Compare the bedroom with your own bed and wardrobe. Show-unit furniture is often smaller than usual. |
| ☐ Ceiling and beams | False ceilings can hide beams and columns. Check their positions on the floor plan. |
| ☐ View, floor and facing | The show unit is usually in the gallery, not on your floor. Ask about the view at your level and facing. We do not show unit numbers on plans; ask us for positions. |
| ☐ Noise | Galleries are quiet. Ask about nearby blocks, lift and pump rooms near your layout, and road or building-site noise. |
| ☐ Air-con ledge, drying area, windows | Where do the compressors and laundry go? Which windows open fully, and which are fixed glass? |
Completion year or vacant possession: which one binds?
The brochure’s completion year is a target. The binding date is in your agreement. Under the Schedule H agreement (strata buildings), vacant possession is due within 36 months of the agreement date (clause 25(1)), and late delivery earns liquidated damages calculated day by day at 10% a year (clause 25(2)). Under Schedule G (landed homes), the period is 24 months (clause 24(1)). Vacant possession also depends on the certificate of completion and compliance being issued (Schedule H, clause 27(1)(a)). The dates in your own agreement are the ones that apply.
On the ground: access, noise, floods, schools, parking
| Check | How to check it |
|---|---|
| ☐ Access to CIQ and RTS | Walk it yourself, or use a Google Maps or OpenStreetMap walking route rather than a straight line. Note crossings and covered sections. Treat a developer’s figure as the developer’s, and ask if a link is built or only proposed. See our RTS walk zone index. |
| ☐ Noise | Visit at rush hour and at night. Stand on the balcony or at the site edge and listen for traffic, trains, bars and building works. |
| ☐ Flooding | Ask guards and neighbours about past floods. Look at drains, low spots and car-park ramps. Read our flooding by area page. |
| ☐ School | Check catchment rules with the school or the state education office, then drive the morning route at school time. |
| ☐ Parking at busy times | Check visitor and street parking on weekday evenings and weekends. Try the ramp and bay width with your own car. |
Extra checks for a subsale in Johor Bahru
| Check | What to ask or look for |
|---|---|
| ☐ Strata title status | Ask if the individual strata title (under the Strata Titles Act 1985) has been issued. If not, ask your lawyer how the transfer and the loan will work. Johor’s land office has offered online private searches of strata titles through the eStrata portal since 25 Mar 2025, and your lawyer will run the official search. |
| ☐ Title type and encumbrances | Residential or commercial, freehold or leasehold, and any charge or caveat on the title. |
| ☐ Maintenance and other arrears | Ask management for the monthly charge, the sinking fund and a statement that the unit has no arrears. Ask to see recent management accounts. |
| ☐ Defect cover left | The 24 months start from the first buyer’s vacant possession date, so a unit handed over two years ago may have none left. Ask your lawyer if any remaining cover passes to you. |
| ☐ Renovations | Ask what was removed or moved, especially walls, wet areas and balcony doors. If the work is recent, ask for the contractor’s details. |
| ☐ Tenanted or vacant | Ask if there is a tenant and when you can enter to inspect. Inspect with the lights, taps and air-con switched on. |
For the costs of a subsale, see our subsale upfront costs page. Buying your first home? You may qualify for the first-home stamp duty exemption.
Common defects and the 24-month defect liability period
| Check | How to test it |
|---|---|
| ☐ Walls and ceiling | Look for cracks wider than a hairline, damp patches, bubbling paint and mould in corners. |
| ☐ Floor tiles | Tap each tile with a coin; a hollow sound means poor bonding. Check for uneven edges between tiles. |
| ☐ Bathroom and balcony | Pour water and see that it flows to the drain. Run every tap and flush the toilet. Check under windows and balcony edges for seepage. |
| ☐ Doors, windows, locks | Open and close every door and window. Check alignment, gaps and locks. |
| ☐ Electrical | Test every socket and switch with a plug-in tester or phone charger. Press the trip test button on the distribution board. |
| ☐ Common areas | Check lifts, lobbies, stairwells and the car park for leaks, damage and lighting. |
- Under the standard Schedule H agreement, the developer must repair, at its own cost and within 30 days, defects that appear within 24 months after you take vacant possession (clause 30(1)). Schedule G has the same 24 months and 30 days (clause 27(1)).
- Under Schedule G clause 27(2), if the developer does nothing, the buyer may carry out the works and deduct the cost from the sum held by the developer’s solicitors as stakeholders.
- Report defects in writing with dated photos and keep copies. Inspect before you renovate.
- Your own agreement may differ from the standard form, so confirm with your lawyer.
Projects to try this checklist on
These are in our Walk to CIQ and RTS group. Walks are our measured routes, with walking time in brackets. Where a shorter distance, we mark it as theirs and say if the link is only proposed. Three are under construction, so the show unit is what you see; one is completed, so you can inspect the real unit.
Coronade Twins @ Coronation Square
A good test of show unit versus real unit: ask which link bridges are built and what the finished unit includes.
Aethera Residences
A wide size range (650 to 2,547 sq ft built-up), so check built-up versus net area and the title type on the project page.
Gen Sphere
Compact units (459 to 755 sq ft built-up), so measure furniture scale in the show unit and confirm the title type.
Suasana Iskandar
Completed, so you can run the subsale checks on a real unit: strata title status, title type, arrears and defects.
Want a viewing arranged?
Tell us which project or subsale unit you want to see, and we will help with the checklist.
Common questions
How long is the defect liability period for a new home in Malaysia?
Under the standard Schedule G and Schedule H agreements, 24 months after you take vacant possession. The developer must fix defects at its own cost within 30 days. Your agreement may differ, so check it.
What should I compare between the show unit and the real unit?
Compare the fittings list in the agreement with what you see, measure rooms with a tape, check beam positions on the plan and ask about the view at your floor and facing.
How do I check the strata title of a subsale unit in Johor?
Ask the seller if the individual strata title is issued, then have your lawyer do the official land search. Johor has offered online private strata title searches through eStrata since 25 Mar 2025.
Is the completion date the same as vacant possession?
Not always. The brochure year is a target. The binding date is the vacant possession deadline in your agreement, which also depends on the certificate of completion and compliance.
How do I measure the real walk to the CIQ or RTS?
Use a walking route on Google Maps or OpenStreetMap, not a straight line, and count only bridges and walkways that already exist. Our method is on the walk zone index.
Sources: Housing Development (Control and Licensing) Regulations 1989, Schedule H and Schedule G (copies hosted by third parties); Johore Bar circular 11/2025 on eStrata searches; EdgeProp defect liability guide for reporting tips. General information, not legal or investment advice. Cover photo: Christian Lue, Unsplash.
[…] property viewing checklist for Johor Bahru covers what to ask at the sales […]
[…] defects and DLP; iProperty, Homebuyers Tribunal; PropertyGuru, handover procedures. Also see our viewing checklist and renovation contractor checks. General information, not legal advice. Cover photo: Jakub […]