In Johor Bahru, any work that adds to or changes the structure of your house, such as extending the kitchen, adding a room or putting up an awning, needs written approval from MBJB before you start. Purely cosmetic jobs are usually simpler, but even tiling or a new facade can run into trouble if it touches the structure or the outside look. For a condo, you also need the management body to agree. Plan the permit and the budget together, so your first renovation does not stall halfway.
Updated 17 Nov 2026. General information, not legal or financial advice. Details below are from MBJB guidelines; other councils such as MBIP or MBPG have their own rules.
What the law requires
NextSix, in a Nov 2025 guide, points to Section 70 of the Street, Drainage and Building Act 1974: no one may erect or alter a building without prior written permission from the local authority. Councils can issue notices, stop work and take the owner to court for unapproved work.
MBJB small renovation permit
MBJB has a guideline for small additions and alterations to houses that already have their certificate of fitness. It covers terrace, semi-D, cluster and detached houses. The main points:
- Submit an application form with a sketch plan, showing additions in red and demolitions in yellow dashed lines.
- For terrace, semi-D and cluster homes where a structure is shared, attach the neighbour consent certificate with a copy of their assessment tax bill.
- Work beyond the standard sketch plans, such as a reinforced concrete roof or a new slab, must be submitted by a qualified professional, with an engineer certifying the calculations.
- Setbacks apply. The guideline shows 6.0 m from the front road reserve to the wall and 2.5 m for porches. Ask MBJB to confirm the figure for your lot.
- The permit is valid for one year. The owner stays fully responsible for the structure.
Awnings need their own temporary permit
Since 1 Jan 2020, MBJB requires a temporary permit for house awnings. Its brochure says approval takes about two weeks, only non-permanent materials such as metal deck or tempered glass are allowed, gutters are required, and neighbours must consent if poles sit on a shared wall. You need your MyKad, the latest assessment tax bill in your name, the title, photos and a sketch. Apply at the Building Control counter or by email to kawalanbangunan@mbjb.gov.my.
Planning to renovate after you buy?
Tell us the home type and what you want to change. We will share what to check before you choose a home.
Condos: management approval too
NextSix notes that condo renovations normally need the JMB or management corporation to approve, often with a refundable deposit, lift protection, insurance and before and after photos. Noise hours are stricter, and wet works may need a waterproofing guarantee. Council approval may still be needed if the structure or building services are affected.
Building your first renovation budget
- Must do first: safety and defects, such as grilles, locks, leaks and wiring checks. Report developer defects within the defect liability period before you renovate over them.
- Needed to live: kitchen basics, water heater, lights and fans, curtains.
- Can wait: extensions, awnings, built-in cabinets and landscaping.
- Permit and professional fees: council fees, any architect or engineer, and condo deposits.
- A buffer: keep extra cash for surprises, and pay contractors in stages tied to finished work.
Get at least three written quotes, ask the contractor for Contractors All Risks insurance with public liability, and read our guide on renovation contractor risks in Johor Bahru. Use the handover day checklist before any work begins.
Want a home that needs less work?
We can suggest new projects in Johor, including Bumi lots with a Bumi SPA price 15% lower than the non-Bumi price.
Common questions
Do I need a permit to extend my kitchen?
Yes. An extension changes the building, so MBJB approval is needed first, with neighbour consent for shared structures.
How long does an awning permit take in MBJB?
MBJB says about two weeks once the application is complete.
Can my contractor apply for me?
Contractors often help, but the owner is responsible. Make sure the application is in your name and you keep the approval letter.
What if I renovate without approval?
The council can issue notices, stop the work or require removal, and it may affect insurance claims.
Sources: MBJB, small renovation guideline; MBJB, house awning brochure; NextSix, renovation permits (Nov 2025). General information, not legal or financial advice. Cover photo: Louis Hansel, Unsplash.