Jadual Spesifikasi Binaan dalam SPA: Cara Baca Sebelum Tandatangan

· Rumah Bumi Johor

Building materials at a housing construction site

Most buyers read the price, the payment schedule and the completion date in their SPA, then skip the pages at the back. One of those pages is the list that tells you what your house will actually be built with. In the standard SPA for a new home it is called the building description or specification schedule, and it is the page to check when the finished house does not look like what you expected.

Updated 19 Nov 2026. General information, not legal or financial advice.

Quick answer: The specification schedule lists the materials and fittings the developer must use, from the structure and roof to the tiles, doors and electrical points. The developer cannot change them without your written consent unless the authorities require it, and if different materials are used you may ask for a price reduction or claim damages.

Where to find it in your SPA

New homes from licensed developers are sold on standard forms under the Housing Development (Control and Licensing) Regulations 1989: Schedule G for landed houses and Schedule H for strata units such as condos and apartments. In the Schedule G text published by the National House Buyers Association (HBA), the building description is attached as the Fourth Schedule and is referred to in the clause on materials and workmanship. The blanks are filled in for each project, so two projects by the same developer can have different lists.

What the list covers

Item What to look for
Structure, walls (brick) Reinforced concrete frame; type of wall, for example clay brick, cement brick or panels
Roof covering and roof frame Concrete or clay tiles, metal deck; timber or steel trusses
Ceiling Plaster ceiling or skim coat, and in which rooms
Windows, doors, locks Aluminium or timber frames, glass type, main door type, lockset
Floor finishes Tiles in living, kitchen, bedrooms and toilets, or cement screed only
Wall tiles Height of tiles in toilets and kitchen
Sanitary and plumbing Number of WCs, basins, showers, taps, kitchen sink
Electrical installation Number of light points, power points, fan points, air-conditioning points
Fencing, gates, turfing For landed homes: fence type and where it runs
Telephone or data trunking, gas piping Whether provided at all
Items follow the building description in the Schedule G text published by HBA. Wording in your SPA may differ.

Count the points. A list that says one power point per bedroom tells you to budget for extra wiring during renovation. If the size of the house matters, read our guide on built-up area versus land area together with this list.

Got the SPA draft and not sure what the schedule means?

Send us the project name. We will point out the items buyers usually ask about.

Can the developer change the materials?

The clause on materials and workmanship says the building must be built in a good and workmanlike manner according to the building description and the approved plans, and that no changes may be made without the written consent of the purchaser, except changes required by the authority. If the developer uses cheaper materials or leaves out work, the purchaser is entitled to a price reduction or damages.

The Federal Court confirmed this in Chong Nge Wei and others v Kemajuan Masteron Sdn Bhd [2022] 4 CLJ 833. A law firm summary of the case notes that the right applies when different materials are used without written consent, not only cheaper ones, and that buyers still need to prove their loss, for example with a quotation for remedial work.

Five checks before you sign

  1. Ask for the full SPA draft with all schedules, not only the price page.
  2. Compare the specification list with the brochure and the show unit. Our guide on show unit versus actual unit explains why the list wins.
  3. Look for vague words such as equivalent or approved substitute next to brand names, and ask what they mean in practice.
  4. Write down what is not included, such as kitchen cabinets, water heaters or grilles, so you can budget for them.
  5. Keep a copy of the signed SPA with its schedules. You will need it at handover and during the defect period.

Using the list at handover

Bring the list when you collect the keys. Tick each item: the number of points, the tile areas, the door types. Report anything missing or different in writing to the developer. For defects in workmanship, see our guide to common defects in new terrace houses.

Collecting keys soon?

Ask us for a simple handover checklist based on your SPA schedule.

Common questions

Where is the specification list in my SPA?

It is one of the schedules at the back of the standard SPA, usually titled building description or specifications. In the Schedule G text published by HBA it is the Fourth Schedule.

The developer used a different tile brand. What can I do?

Check the exact wording in the schedule. If the material differs from what is listed and you did not consent in writing, you may ask for a price reduction or claim damages, with proof of your loss.

Is everything in the show unit in the list?

No. Show units often have extras that are not in the specification schedule. Only what is written in the SPA and its schedules is promised.

Can I ask for changes before signing?

You can ask. Any agreed change should be put in writing and signed by the developer, so it forms part of your record.

Sources: Schedule G text and building description, published by HBA; Bodipalar Ponnudurai De Silva on Chong Nge Wei v Kemajuan Masteron (18 Nov 2022); Malay Mail on the Danga Bay show unit ruling (10 Feb 2021). Cover photo: Marek Studzinski, Unsplash.